<< Chapter < Page
  Digital signal processing - dsp     Page 18 / 25
Chapter >> Page >

The code in Listing 24 :

  • Creates the JPanel object, and sets its layout property to GridLayout.
  • Creates the requisite number of objects of the MyCanvas class (which extends Canvas), setting the background colors of the panels alternately towhite and gray.
  • Adds the MyCanvas objects to the cells in the grid. (Note that the constructor for each MyCanvas object receives an integer that specifies itsposition in the stack of MyCanvas objects. We will see how that information is used later.)

More routine construction code

The code in Listing 25 is simply more routine code required to:

  • Finish the construction of the GUI object
  • Set its location and size on the screen
  • Make it visible

Once again, I will let the comments serve as the explanation for this code.

Listing 25. More routine construction code.
//Add the sub-assemblies to the // frame. Set its location, size,// and title, and make it visible. getContentPane().add(ctlPnl,"South"); getContentPane().add(canvasPanel,"Center"); setBounds(0,0,frmWidth,frmHeight);setTitle("Graph01, " + "Copyright 2002, " +"Richard G. Baldwin"); setVisible(true);//Set to exit on X-button click setDefaultCloseOperation(EXIT_ON_CLOSE); //Get and save the size of the// plotting surface width = canvases[0].getWidth(); height = canvases[0].getHeight();

Force a repaint

As you will see later, the actual plotting behavior of this program is defined by the code in an overridden version of the paint method in the MyCanvas class. I will discuss that code in some detail later.

One way to cause the code in the overridden paint method to be executed is to call the repaint method on a reference to a MyCanvas object.

The code in Listing 26 calls the repaint method on each MyCanvas object in sequence, to guarantee that they are properly painted when the GUI object first becomes visible.

Listing 26. Force a repaint.
for(int cnt = 0; cnt<number; cnt++){ canvases[cnt].repaint(); }//end for loop}//end constructor

Similar code will be used again later to cause the graphs to be repainted each time the user presses the Graph button in the bottom right corner of Figure 1 .

End of the constructor

The code in Listing 26 also ends the constructor for the GUI object. When the constructor finishes execution, the GUI appears on the screen with all plotting areas properly painted.

Re-plotting the data

[link] shows the beginning of the event handler that is registered on the button to cause the functions to be re-plotted.

Beginning of the re-plot code.
public void actionPerformed( ActionEvent evt){//Re-instantiate the object that // provides the datatry{ if(args != null){data = (GraphIntfc01)Class. forName(args).newInstance();}else{ data = new junk();}//end else }catch(Exception e){//Known to be safe at this point. // Otherwise would have aborted// earlier. }//end catch

The purpose of the event handler is to cause the functions to be re-plotted after the user changes the plotting parameters.

Questions & Answers

it is the relatively stable flow of income
Chidubem Reply
what is circular flow of income
Divine Reply
branches of macroeconomics
SHEDRACK Reply
what is Flexible exchang rate?
poudel Reply
is gdp a reliable measurement of wealth
Atega Reply
introduction to econometrics
Husseini Reply
Hi
mostafa
hi
LEMLEM
hello
Sammol
hi
Mahesh
bi
Ruqayat
hi
Ruqayat
Hi fellas
Nyawa
hey
Sammol
hi
God
hello
Jahara
Good morning
Jorge
hi
abubakar
hi
Nmesoma
hi
Mahesh
Hi
Tom
Why is unemployment rate never zero at full employment?
Priyanka Reply
bcoz of existence of frictional unemployment in our economy.
Umashankar
what is flexible exchang rate?
poudel
due to existence of the pple with disabilities
Abdulraufu
the demand of a good rises, causing the demand for another good to fall
Rushawn Reply
is it possible to leave every good at the same level
Joseph
I don't think so. because check it, if the demand for chicken increases, people will no longer consume fish like they used to causing a fall in the demand for fish
Anuolu
is not really possible to let the value of a goods to be same at the same time.....
Salome
Suppose the inflation rate is 6%, does it mean that all the goods you purchase will cost 6% more than previous year? Provide with reasoning.
Geetha Reply
Not necessarily. To measure the inflation rate economists normally use an averaged price index of a basket of certain goods. So if you purchase goods included in the basket, you will notice that you pay 6% more, otherwise not necessarily.
Waeth
discus major problems of macroeconomics
Alii Reply
what is the problem of macroeconomics
Yoal
Economic growth Stable prices and low unemployment
Ephraim
explain inflationcause and itis degre
Miresa Reply
what is inflation
Getu
increase in general price levels
WEETO
Good day How do I calculate this question: C= 100+5yd G= 2000 T= 2000 I(planned)=200. Suppose the actual output is 3000. What is the level of planned expenditures at this level of output?
Chisomo Reply
how to calculate actual output?
Chisomo
how to calculate the equilibrium income
Beshir
Criteria for determining money supply
Thapase Reply
who we can define macroeconomics in one line
Muhammad
Aggregate demand
Mohammed
C=k100 +9y and i=k50.calculate the equilibrium level of output
Mercy Reply
Hi
Isiaka
Hi
Geli
hy
Man
👋
Bahunda
hy how are you?
Man
ys
Amisha
how are you guys
Sekou
f9 guys
Amisha
how are you guys
Sekou
ys am also fine
Amisha
fine and you guys
Geli
from Nepal
Amisha
nawalparasi district from belatari
Amisha
nd u
Amisha
I am Camara from Guinea west Africa... happy to meet you guys here
Sekou
ma management ho
Amisha
ahile becheclor ho
Amisha
hjr ktm bta ho ani k kaam grnu hunxa tw
Amisha
belatari
Amisha
1st year ho
Amisha
nd u
Amisha
ahh
Amisha
kaha biratnagar
Amisha
ys
Amisha
kina k vo
Amisha
money as unit of account means what?
Kalombe
A unit of account is something that can be used to value goods and services and make calculations
Jim
all of you please speak in English I can't understand you're language
Muhammad
I want to know how can we define macroeconomics in one line
Muhammad
it must be .9 or 0.9 no Mpc is greater than 1 Y=100+.9Y+50 Y-.9Y=150 0.1Y/0.1=150/0.1 Y=1500
Kalombe
Mercy is it clear?😋
Kalombe
hi can someone help me on this question If a negative shocks shifts the IS curve to the left, what type of policy do you suggest so as to stabilize the level of output? discuss your answer using appropriate graph.
Galge Reply
if interest rate is increased this will will reduce the level of income shifting the curve to the left ◀️
Kalombe
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Digital signal processing - dsp. OpenStax CNX. Jan 06, 2016 Download for free at https://legacy.cnx.org/content/col11642/1.38
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Digital signal processing - dsp' conversation and receive update notifications?

Ask