<< Chapter < Page
  Digital signal processing - dsp     Page 4 / 25
Chapter >> Page >

In the case of Figure 2 , the origin was moved to the left, the total expanse of the horizontal axis was increased, and the space between the tic marks on thevertical axis was increased from 20 units to 50 units.

(It will help you to see the differences if you will position two browser windows side-by-side while viewing one display in one browser windowand viewing the other display in the other browser window.)

Discussion and sample code

Testing the plotting program

I am assuming that you have accomplished the minimal steps required to get the Java Development Kit (JDK) that is available from Oracle installed on your computer

To run the plotting program named Graph01 in self-test mode, do the following:

  • Copy the code in Listing 39 into a file named Graph01.java .
  • Copy the code in Listing 1 into a file named GraphIntfc.java , and put that file in the same directory as the file named Graph01.java above.
  • Compile the program named Graph01.java using the Java Development Kit (JDK) . (Note, you must be using Java Standard Edition (SE) version 1.4 or later. On the date of this module update, JavaSE 8u60 is the latest released version.)

At this point, you should be able to execute the program named Graph01 in self-test mode by entering the following command at the command prompt in the same directory where you compiled the program:

java Graph01

If everything has been done correctly up to this point, a display similar to that shown in Figure 4 should appear on your screen. (Note that you may need to match up the parameter values in the text fields at the bottom of the frameand click the Graph button to cause the two displays to match exactly.)

Using the plotting program

To use the plotting program with your own data generator program, do the following:

  • Still working in the same directory, define and compile a data generator class that implements the interface named GraphIntfc01 , shown in Listing 1 .
  • Start the plotting program named Graph01 running by following the instructions that I will provide below.

Plotting your data using Graph01

Assume that your data-generator class is named MyData , and that you have successfully compiled it in the same directory as the compiledversion of Graph01.

The next step is to enter the following command at the command prompt in the same directory. (Note that this command differs from the command given earlier. This command provides the name of your class as a command-line argument following the name of the plotting program.)

java Graph01 MyData

When you do this, the plotting program should start pulling the necessary data from your data-generator program and plotting that data in the format shownin Figure 1 .

Modifying plotting parameters

Once all the curves have been plotted, you can change any of the plotting parameter values in the text fields at the bottom of the display and press thebutton labeled Graph . When you press the button, the plotting program will re-plot your data using the new plotting parameters.

The plotting parameters

Here is the meaning of the plotting-parameter text fields shown in Figure 1 :

Questions & Answers

how did you get 1640
Noor Reply
If auger is pair are the roots of equation x2+5x-3=0
Peter Reply
Wayne and Dennis like to ride the bike path from Riverside Park to the beach. Dennis’s speed is seven miles per hour faster than Wayne’s speed, so it takes Wayne 2 hours to ride to the beach while it takes Dennis 1.5 hours for the ride. Find the speed of both bikers.
MATTHEW Reply
420
Sharon
from theory: distance [miles] = speed [mph] × time [hours] info #1 speed_Dennis × 1.5 = speed_Wayne × 2 => speed_Wayne = 0.75 × speed_Dennis (i) info #2 speed_Dennis = speed_Wayne + 7 [mph] (ii) use (i) in (ii) => [...] speed_Dennis = 28 mph speed_Wayne = 21 mph
George
Let W be Wayne's speed in miles per hour and D be Dennis's speed in miles per hour. We know that W + 7 = D and W * 2 = D * 1.5. Substituting the first equation into the second: W * 2 = (W + 7) * 1.5 W * 2 = W * 1.5 + 7 * 1.5 0.5 * W = 7 * 1.5 W = 7 * 3 or 21 W is 21 D = W + 7 D = 21 + 7 D = 28
Salma
Devon is 32 32​​ years older than his son, Milan. The sum of both their ages is 54 54​. Using the variables d d​ and m m​ to represent the ages of Devon and Milan, respectively, write a system of equations to describe this situation. Enter the equations below, separated by a comma.
Aaron Reply
find product (-6m+6) ( 3m²+4m-3)
SIMRAN Reply
-42m²+60m-18
Salma
what is the solution
bill
how did you arrive at this answer?
bill
-24m+3+3mÁ^2
Susan
i really want to learn
Amira
I only got 42 the rest i don't know how to solve it. Please i need help from anyone to help me improve my solving mathematics please
Amira
Hw did u arrive to this answer.
Aphelele
hi
Bajemah
-6m(3mA²+4m-3)+6(3mA²+4m-3) =-18m²A²-24m²+18m+18mA²+24m-18 Rearrange like items -18m²A²-24m²+42m+18A²-18
Salma
complete the table of valuesfor each given equatio then graph. 1.x+2y=3
Jovelyn Reply
x=3-2y
Salma
y=x+3/2
Salma
Hi
Enock
given that (7x-5):(2+4x)=8:7find the value of x
Nandala
3x-12y=18
Kelvin
please why isn't that the 0is in ten thousand place
Grace Reply
please why is it that the 0is in the place of ten thousand
Grace
Send the example to me here and let me see
Stephen
A meditation garden is in the shape of a right triangle, with one leg 7 feet. The length of the hypotenuse is one more than the length of one of the other legs. Find the lengths of the hypotenuse and the other leg
Marry Reply
how far
Abubakar
cool u
Enock
state in which quadrant or on which axis each of the following angles given measure. in standard position would lie 89°
Abegail Reply
hello
BenJay
hi
Method
I am eliacin, I need your help in maths
Rood
how can I help
Sir
hmm can we speak here?
Amoon
however, may I ask you some questions about Algarba?
Amoon
hi
Enock
what the last part of the problem mean?
Roger
The Jones family took a 15 mile canoe ride down the Indian River in three hours. After lunch, the return trip back up the river took five hours. Find the rate, in mph, of the canoe in still water and the rate of the current.
cameron Reply
Shakir works at a computer store. His weekly pay will be either a fixed amount, $925, or $500 plus 12% of his total sales. How much should his total sales be for his variable pay option to exceed the fixed amount of $925.
mahnoor Reply
I'm guessing, but it's somewhere around $4335.00 I think
Lewis
12% of sales will need to exceed 925 - 500, or 425 to exceed fixed amount option. What amount of sales does that equal? 425 ÷ (12÷100) = 3541.67. So the answer is sales greater than 3541.67. Check: Sales = 3542 Commission 12%=425.04 Pay = 500 + 425.04 = 925.04. 925.04 > 925.00
Munster
difference between rational and irrational numbers
Arundhati Reply
When traveling to Great Britain, Bethany exchanged $602 US dollars into £515 British pounds. How many pounds did she receive for each US dollar?
Jakoiya Reply
how to reduced echelon form
Solomon Reply
Jazmine trained for 3 hours on Saturday. She ran 8 miles and then biked 24 miles. Her biking speed is 4 mph faster than her running speed. What is her running speed?
Zack Reply
d=r×t the equation would be 8/r+24/r+4=3 worked out
Sheirtina
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Digital signal processing - dsp. OpenStax CNX. Jan 06, 2016 Download for free at https://legacy.cnx.org/content/col11642/1.38
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Digital signal processing - dsp' conversation and receive update notifications?

Ask