<< Chapter < Page
  Xna game studio     Page 3 / 8
Chapter >> Page >

I will begin my explanation with the class named Sprite .

The Sprite class

The file named Sprite.cs (see Listing 14 ) defines a simple version of a Sprite class from which multiple Sprite objects can be instantiated, loaded with an image, and drawn in the game window.The Position property of each Sprite object can be accessed by the user to control the position at which the sprite isdrawn.

The definition of the Sprite class begins in Listing 1 .

Listing 1 . Beginning of the Sprite class.

namespace XNA0126Proj { class Sprite {private Texture2D texture; private Vector2 position = new Vector2(0,0);//-------------------------------------------------// public Vector2 Position {get { return position;}//end get set {position = value; }//end set}//end Position property accessor

Two instance variables and a property accessor method

Listing 1 declares two instance variables and defines an accessor for the Position property.

The first instance variable named texture will be used to store the image for the sprite. The second instance variable named position will be used to store the value for the Position property.

Two overloaded constructors

Listing 2 defines two overloaded constructors for the Sprite class.

Listing 2 . Two overloaded constructors.

public Sprite() {//constructor }//end noarg constructor//-------------------------------------------------// public Sprite(String assetName,ContentManager contentManager) { texture =contentManager.Load<Texture2D>(assetName); }//end constructor

No image when instantiated

The first overloaded constructor, which requires no parameters, makes it possible to instantiate a Sprite object without loading an image for the object when it is constructed. A method named SetImage can be called later to load an image for the object.

Be aware that if you instantiate a Sprite object using this constructor and then attempt to draw the object without first calling the SetImage method to load an image into the object, the program will fail with a runtime error.

Image loaded during construction

The second overloaded constructor, which requires two parameters, makes it possible to load an image for the Sprite object when it is constructed.

The first parameter

The first parameter required by the second constructor is the Asset Name property for an image file that is added to the Content folder during the project design phase.

The second parameter

The second parameter is a reference to the ContentManager object that is inherited into the Game1 object from the Game class.

Loading the image

You are already familiar with the code in the body of the constructor that is used to load the image into the object.

The SetImage method

The SetImage method is shown in its entirety in Listing 3 .

Listing 3 . The SetImage method.

public void SetImage(String assetName, ContentManager contentManager) {texture = contentManager.Load<Texture2D>(assetName); }//end SetImage

Load an image into a Sprite object

The SetImage method makes it possible to load an image into a Sprite object that was originally constructed without an image , or to change the image in a Sprite object that already contains an image.

Questions & Answers

it is the relatively stable flow of income
Chidubem Reply
what is circular flow of income
Divine Reply
branches of macroeconomics
SHEDRACK Reply
what is Flexible exchang rate?
poudel Reply
is gdp a reliable measurement of wealth
Atega Reply
introduction to econometrics
Husseini Reply
Hi
mostafa
hi
LEMLEM
hello
Sammol
hi
Mahesh
bi
Ruqayat
hi
Ruqayat
Hi fellas
Nyawa
hey
Sammol
hi
God
hello
Jahara
Good morning
Jorge
hi
abubakar
hi
Nmesoma
hi
Mahesh
Hi
Tom
Why is unemployment rate never zero at full employment?
Priyanka Reply
bcoz of existence of frictional unemployment in our economy.
Umashankar
what is flexible exchang rate?
poudel
due to existence of the pple with disabilities
Abdulraufu
the demand of a good rises, causing the demand for another good to fall
Rushawn Reply
is it possible to leave every good at the same level
Joseph
I don't think so. because check it, if the demand for chicken increases, people will no longer consume fish like they used to causing a fall in the demand for fish
Anuolu
is not really possible to let the value of a goods to be same at the same time.....
Salome
Suppose the inflation rate is 6%, does it mean that all the goods you purchase will cost 6% more than previous year? Provide with reasoning.
Geetha Reply
Not necessarily. To measure the inflation rate economists normally use an averaged price index of a basket of certain goods. So if you purchase goods included in the basket, you will notice that you pay 6% more, otherwise not necessarily.
Waeth
discus major problems of macroeconomics
Alii Reply
what is the problem of macroeconomics
Yoal
Economic growth Stable prices and low unemployment
Ephraim
explain inflationcause and itis degre
Miresa Reply
what is inflation
Getu
increase in general price levels
WEETO
Good day How do I calculate this question: C= 100+5yd G= 2000 T= 2000 I(planned)=200. Suppose the actual output is 3000. What is the level of planned expenditures at this level of output?
Chisomo Reply
how to calculate actual output?
Chisomo
how to calculate the equilibrium income
Beshir
Criteria for determining money supply
Thapase Reply
who we can define macroeconomics in one line
Muhammad
Aggregate demand
Mohammed
C=k100 +9y and i=k50.calculate the equilibrium level of output
Mercy Reply
Hi
Isiaka
Hi
Geli
hy
Man
👋
Bahunda
hy how are you?
Man
ys
Amisha
how are you guys
Sekou
f9 guys
Amisha
how are you guys
Sekou
ys am also fine
Amisha
fine and you guys
Geli
from Nepal
Amisha
nawalparasi district from belatari
Amisha
nd u
Amisha
I am Camara from Guinea west Africa... happy to meet you guys here
Sekou
ma management ho
Amisha
ahile becheclor ho
Amisha
hjr ktm bta ho ani k kaam grnu hunxa tw
Amisha
belatari
Amisha
1st year ho
Amisha
nd u
Amisha
ahh
Amisha
kaha biratnagar
Amisha
ys
Amisha
kina k vo
Amisha
money as unit of account means what?
Kalombe
A unit of account is something that can be used to value goods and services and make calculations
Jim
all of you please speak in English I can't understand you're language
Muhammad
I want to know how can we define macroeconomics in one line
Muhammad
it must be .9 or 0.9 no Mpc is greater than 1 Y=100+.9Y+50 Y-.9Y=150 0.1Y/0.1=150/0.1 Y=1500
Kalombe
Mercy is it clear?😋
Kalombe
hi can someone help me on this question If a negative shocks shifts the IS curve to the left, what type of policy do you suggest so as to stabilize the level of output? discuss your answer using appropriate graph.
Galge Reply
if interest rate is increased this will will reduce the level of income shifting the curve to the left ◀️
Kalombe
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, Xna game studio. OpenStax CNX. Feb 28, 2014 Download for free at https://legacy.cnx.org/content/col11634/1.6
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'Xna game studio' conversation and receive update notifications?

Ask