<< Chapter < Page Chapter >> Page >
Summary of David Wiley's post about the role of open content in open education.

“Content Is Infrastructure,” the 14th installment of the Impact of Open Source Software Series, was posted on October 3rd, 2007, by David Wiley who currently serves as an Associate Professor of Instructional Technology and also the Director of the Center for Open and Sustainable Learning , (C()SL), at Utah State University. Thanks David for a great posting!

In his posting David starts by suggesting that “Content is Infrastructure,” and then makes three related statements (relative to the development of education):

  1. I wish to point out that content is absolutely critical.
  2. I want to suggest that we must understand that content is infrastructure before we can see radical improvements in education.
  3. We have to understand that content is infrastructure to see current “open educational resources” projects and initiatives from the proper perspective.

David used physical infrastructure in the form of public roads as an analogy for content as digital education infrastructure. He suggested that as roads allow for development and innovation, content (without toll fees) allows similarly for innovation to take place in education. Unlike roads though, content infrastructure is much more effectively developed through massively parallel, trial, and error processes than through a formally architected approach.

Comments

David’s “roads” analogy generated a fair amount of discussion leading to extension of the analogy and discussion about the “economics” of creating and sustaining content infrastructure. Issues such as the difference between physical and non-physical assets, rival and non-rival goods, the impact of “tolls” or use fees, barriers, and incentives were discussed.

There was also some dialog about how individuals will show interest in and verbally support open content, but when “push comes to shove” few will actually make their resources open. Issues around the competitive nature of higher education were raised. It was noted that the free software movement is quite competitive and that competition seems to work well in that domain, which led to some questions about using the competitive impulse at many universities to promote open and free resources.

It was also noted, early in the discussion that David’s “content as infrastructure” approach to OER was refreshingly direct and pragmatic.

Thanks again to David, for his interesting and insightful post and responses, and Wayne, Cole, and Martin (RedSevenOne), for making this a great exchange, and other folks who have been reading along. Please join in again on October 17th when Gary Schwartz posts with persepctis from a OSS project manager. The schedule for the series can be found on WikiEducator.

Questions & Answers

how did you get 1640
Noor Reply
If auger is pair are the roots of equation x2+5x-3=0
Peter Reply
Wayne and Dennis like to ride the bike path from Riverside Park to the beach. Dennis’s speed is seven miles per hour faster than Wayne’s speed, so it takes Wayne 2 hours to ride to the beach while it takes Dennis 1.5 hours for the ride. Find the speed of both bikers.
MATTHEW Reply
420
Sharon
from theory: distance [miles] = speed [mph] × time [hours] info #1 speed_Dennis × 1.5 = speed_Wayne × 2 => speed_Wayne = 0.75 × speed_Dennis (i) info #2 speed_Dennis = speed_Wayne + 7 [mph] (ii) use (i) in (ii) => [...] speed_Dennis = 28 mph speed_Wayne = 21 mph
George
Let W be Wayne's speed in miles per hour and D be Dennis's speed in miles per hour. We know that W + 7 = D and W * 2 = D * 1.5. Substituting the first equation into the second: W * 2 = (W + 7) * 1.5 W * 2 = W * 1.5 + 7 * 1.5 0.5 * W = 7 * 1.5 W = 7 * 3 or 21 W is 21 D = W + 7 D = 21 + 7 D = 28
Salma
Devon is 32 32​​ years older than his son, Milan. The sum of both their ages is 54 54​. Using the variables d d​ and m m​ to represent the ages of Devon and Milan, respectively, write a system of equations to describe this situation. Enter the equations below, separated by a comma.
Aaron Reply
find product (-6m+6) ( 3m²+4m-3)
SIMRAN Reply
-42m²+60m-18
Salma
what is the solution
bill
how did you arrive at this answer?
bill
-24m+3+3mÁ^2
Susan
i really want to learn
Amira
I only got 42 the rest i don't know how to solve it. Please i need help from anyone to help me improve my solving mathematics please
Amira
Hw did u arrive to this answer.
Aphelele
hi
Bajemah
-6m(3mA²+4m-3)+6(3mA²+4m-3) =-18m²A²-24m²+18m+18mA²+24m-18 Rearrange like items -18m²A²-24m²+42m+18A²-18
Salma
complete the table of valuesfor each given equatio then graph. 1.x+2y=3
Jovelyn Reply
x=3-2y
Salma
y=x+3/2
Salma
Hi
Enock
given that (7x-5):(2+4x)=8:7find the value of x
Nandala
3x-12y=18
Kelvin
please why isn't that the 0is in ten thousand place
Grace Reply
please why is it that the 0is in the place of ten thousand
Grace
Send the example to me here and let me see
Stephen
A meditation garden is in the shape of a right triangle, with one leg 7 feet. The length of the hypotenuse is one more than the length of one of the other legs. Find the lengths of the hypotenuse and the other leg
Marry Reply
how far
Abubakar
cool u
Enock
state in which quadrant or on which axis each of the following angles given measure. in standard position would lie 89°
Abegail Reply
hello
BenJay
hi
Method
I am eliacin, I need your help in maths
Rood
how can I help
Sir
hmm can we speak here?
Amoon
however, may I ask you some questions about Algarba?
Amoon
hi
Enock
what the last part of the problem mean?
Roger
The Jones family took a 15 mile canoe ride down the Indian River in three hours. After lunch, the return trip back up the river took five hours. Find the rate, in mph, of the canoe in still water and the rate of the current.
cameron Reply
Shakir works at a computer store. His weekly pay will be either a fixed amount, $925, or $500 plus 12% of his total sales. How much should his total sales be for his variable pay option to exceed the fixed amount of $925.
mahnoor Reply
I'm guessing, but it's somewhere around $4335.00 I think
Lewis
12% of sales will need to exceed 925 - 500, or 425 to exceed fixed amount option. What amount of sales does that equal? 425 ÷ (12÷100) = 3541.67. So the answer is sales greater than 3541.67. Check: Sales = 3542 Commission 12%=425.04 Pay = 500 + 425.04 = 925.04. 925.04 > 925.00
Munster
difference between rational and irrational numbers
Arundhati Reply
When traveling to Great Britain, Bethany exchanged $602 US dollars into £515 British pounds. How many pounds did she receive for each US dollar?
Jakoiya Reply
how to reduced echelon form
Solomon Reply
Jazmine trained for 3 hours on Saturday. She ran 8 miles and then biked 24 miles. Her biking speed is 4 mph faster than her running speed. What is her running speed?
Zack Reply
d=r×t the equation would be 8/r+24/r+4=3 worked out
Sheirtina
Got questions? Join the online conversation and get instant answers!
Jobilize.com Reply

Get Jobilize Job Search Mobile App in your pocket Now!

Get it on Google Play Download on the App Store Now




Source:  OpenStax, The impact of open source software on education. OpenStax CNX. Mar 30, 2009 Download for free at http://cnx.org/content/col10431/1.7
Google Play and the Google Play logo are trademarks of Google Inc.

Notification Switch

Would you like to follow the 'The impact of open source software on education' conversation and receive update notifications?

Ask